Integrated Optimization Approach of Hybrid Flow-Shop Scheduling Based on Process Set
Considering that process planning and production scheduling are independent Speaker Cable of each other in a hybrid flow-shop, this study categorizes the process route into parallel process-set, batch set and unordered process-set, and builds a multi-objective optimization model to minimize the maximum completion time and the minimum processing cos